Skip to content
Hubarbeitsbühnenservice Majewski Spare parts shopShop
EN
UVV inspection

Once a year. At your site.

The periodic inspection under the DGUV rules, carried out by a competent person. With report, sticker and an honest word about what on the machine is still good and what is not.

Obligation

What has to be inspected.

Anyone who operates an aerial work platform, a forklift or a telehandler must have it inspected once a year by a competent person. This is set out in the German Ordinance on Industrial Safety and Health (Betriebssicherheitsverordnung) and in the rules of the German statutory accident insurance institutions (Berufsgenossenschaften).

We have been working on these machines for many years. We know them from production and from service with the manufacturer. There is hardly anyone who knows them better than we do. The report belongs in the inspection log book of the machine, the sticker on the machine.

After a major repair or a modification, an extraordinary inspection is required. We do that too.

On top of that come the mandatory exhaust emission tests. Our analyser measures gas and diesel engines, on forklifts just as on telehandlers. What many people do not know: TRGS 554 for diesel engines applies not only indoors but also outdoors.

EquipmentIntervalBasis
Aerial work platformsannuallyDGUV Grundsatz 308-002, inspection log book per 308-003
ForkliftsannuallyDGUV Vorschrift 68, DGUV Grundsatz 308-001
TelehandlersannuallyFEM 4.004, DGUV Grundsatz 308-001
Electrical system of the machinewith the main inspectionDGUV Vorschrift 3, measurement per DIN VDE 0701-0702
Diesel engine exhaust (forklifts, telehandlers)at least annually, at the latest after 1,500 operating hoursTRGS 554, in enclosed areas and outdoors
Gas forklifts (LPG)at least annually, gas system and CO measurementDGUV Regel 110‑010
Procedure

How the inspection works.

  1. 1

    Appointment at your site

    The inspection takes place where the machine is. You do not need to take it anywhere.

  2. 2

    Inspection

    Visual inspection, function test, measurement of the electrical system. Emergency lowering, emergency stop, load moment, steel structure, hydraulics.

  3. 3

    Discussing defects

    We discuss anything we find with you straight away. We often fix small things on the spot, and then the inspection is passed.

  4. 4

    Report and sticker

    You receive the test report as a PDF and the sticker on the machine. This keeps you on the safe side with the Berufsgenossenschaft.

Together with maintenance

One appointment instead of two.

The inspection tells you what is broken. The maintenance fixes it. Doing both on the same day saves you a period of downtime.

That is why we like to carry out the UVV inspection together with the annual inspection and maintenance. Anything found during the inspection is fixed directly, and the machine goes back to work with its sticker.

Measuring the electrical system is a job for a qualified electrician. A person who has only been instructed in electrical work is not enough for this. With us, the qualified electrician does the measuring.

Maintenance and repair

Test instrument for the inspection per DGUV Vorschrift 3 on an aerial work platform, printed report next to it
Measurement per DGUV Vorschrift 3 on an aerial work platform. The instrument prints, we explain.

When is your next inspection due?

Look at the sticker. When the date is getting close, get in touch. We will come to you.